ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
VIDYUT SOUDHA  ::  Vijayawada - 520004
Daywise Generation Particulars as on  :  21-04-2018
Station Unit Capacity Daywise generation in MU 1st to 21st Apr 1st Apr to 21st Apr
(MW) 19-04-18 20-04-18 21-04-18 Gen (MU) PLF (%) Gen (MU) PLF (%)
Thermal Power Stations                
Dr.Narla Tatarao Unit 1 210.0 4.21 4.09 4.14 90.02 85.05 90.02 85.05
(Vijayawada) Unit 2 210.0   3.49 4.31 41.08 38.81 41.08 38.81
  Unit 3 210.0 4.17 4.10 3.96 91.50 86.45 91.50 86.45
  Unit 4 210.0 4.17 4.12 4.06 91.49 86.44 91.49 86.44
  Unit 5 210.0 4.38 4.46 4.23 90.56 85.56 90.56 85.56
  Unit 6 210.0 4.13 4.19 3.97 92.83 87.71 92.83 87.71
  Unit 7 500.0 9.77 8.69 10.27 194.25 77.08 194.25 77.08
  Station 1760.0 30.83 33.14 34.94 691.73 77.98 691.73 77.98
Rayalaseema Unit 1 210.0 4.36 4.27 4.22 87.66 82.82 87.66 82.82
  Unit 2 210.0 4.16 3.84 4.11 86.20 81.45 86.20 81.45
  Unit 3 210.0 4.14 4.10 4.17 84.77 80.09 84.77 80.09
  Unit 4 210.0 4.21 4.20 4.23 87.18 82.37 87.18 82.37
  Unit 5 210.0 4.01 4.00 3.95 77.98 73.68 77.98 73.68
  Unit 6 600.0              
  Station 1650.0 20.87 26.19 28.65 437.55 52.61 437.55 52.61
APGENCO Thermal 3410.0 51.70 59.33 63.59 1129.28 65.71 1129.28 65.71
Hydro Power Stations                  
Machkund (AP Utilisation) 84.0 0.62 0.60 0.57 13.44   13.44  
Tungabhadra (AP Utilisation) 57.6              
Upper Sileru 240.0 0.82 1.29 1.37 18.34   18.34  
Donkarayi 25.0              
Lower Sileru 460.0       60.46   60.46  
Srisailam Right 770.0 1.08 0.93 1.74 15.68   15.68  
NS Right Canal 90.0              
NS Tail Pond Dam   50.0       1.32   1.32  
Penna Ahobilam 20.0              
Chettipeta Mini Hydro 1.0              
APGENCO Hydro 1797.6 2.51 2.82 3.68 109.24   109.24  
APGENCO Solar 5.4 0.03 0.02 0.02 0.56   0.56  
APGENCO Total 5213.0 54.21 62.15 67.28 1238.52   1238.52  
                   
Machkund (Total) 120.0 1.19 1.40 1.27 26.17   26.17  
Tungabhadra (Total) 72.0              
APPDCL                  
Total SDSTPS station 1600.0 30.50 24.28 15.34 506.25 62.78 506.25 62.78
Outage of Thermal Units
RTPP 6 (600 MW) was under outage from 13:05hr on 29.03.18 to 23.37hr on 19.04.2018.
RTPP 6 (600 MW) was under outage from 23.53hr on 19.04.18 to 01.38hr on 20.04.2018 due to on electrical fault.
RTPP 6 (600 MW) was under outage from 04.15hr on 20.04.18 to 06.18hr on 20.04.2018 due to turbine side problem.
Dr NTTPS 2 (210 MW) was under outage due to Boiler tube leak from 12:27hr on 08.04.18 to 02.59hr on 20.04.2018.
Outage of Hydro Units
Machkund 3 (17 MW) was tripped at 00.15 hr on 12.04.2018 Upper gear bearing  high temperature
Machkund 6 (23 MW) has been under shutdown due to heavy vibrations since 18:15 on 01.06.17 
Machkund 4 (17 MW) has been under under shutdown since 18:35 on 12.09.17
DNK (25 MW) H/T due to vibrations & GT oil samples abnormal levels from 05:40 on 17.03.18
Lower Sileru - All units stopped at 00.00 on 19.04.2018 for one month due to construction of bridge by R&B Division.
Outage of SDSTPS Units
Nil