ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
VIDYUT SOUDHA  ::  Vijayawada - 520004
Daywise Generation Particulars as on  :  25-02-2020
Station Unit Capacity Daywise generation in MU 1st to 25th Feb 1st Apr to 25th Feb
(MW) 23-02-20 24-02-20 25-02-20 Gen (MU) PLF (%) Gen (MU) PLF (%)
Thermal Power Stations                
Dr.Narla Tatarao Unit 1 210.0 3.68 3.93 4.24 102.12 81.05 1034.73 62.03
(Vijayawada) Unit 2 210.0 3.66 3.93 4.31 63.61 50.48 1126.30 67.51
  Unit 3 210.0 3.71 3.99 1.90 105.11 83.42 1176.15 70.50
  Unit 4 210.0 3.84 3.99 4.19 106.47 84.50 1247.92 74.80
  Unit 5 210.0 3.76 4.08 4.66 105.34 83.60 1227.29 73.57
  Unit 6 210.0 3.81 4.14 4.62 109.62 87.00 1292.16 77.46
  Unit 7 500.0 9.94 11.01 11.60 232.80 77.60 2914.75 73.38
  Station 1760.0 32.40 35.07 35.52 825.07 78.13 10019.30 71.66
Rayalaseema Unit 1 210.0 2.53   0.01 90.23 71.61 829.70 49.73
  Unit 2 210.0       76.02 60.34 558.33 33.47
  Unit 3 210.0       3.40 2.70 996.30 59.72
  Unit 4 210.0 3.73 4.15 4.80 92.39 73.32 869.46 52.12
  Unit 5 210.0       68.41 54.29 635.59 38.10
  Unit 6 600.0       186.51 51.81 2213.64 46.44
  Station 1650.0 6.27 4.15 4.81 516.97 52.22 6102.80 46.56
APGENCO Thermal 3410.0 38.67 39.22 40.33 1342.04 65.59 16122.09 59.52
Hydro Power Stations                
Machkund (AP Utilisation) 84.0 0.96 0.96 1.01 20.96   304.64  
Tungabhadra (AP Utilisation) 57.6 0.57 0.50 0.43 13.91   136.47  
Upper Sileru 240.0 2.46 3.12 2.84 51.85   546.47  
Donkarayi 25.0 0.28 0.28 0.29 7.06   64.13  
Lower Sileru 460.0 3.04 2.50 3.17 74.29   746.26  
Srisailam Right 770.0 15.21 13.21 13.47 95.05   1249.44  
NS Right Canal 90.0           102.12  
NS Tail Pond Dam   50.0       0.18   78.79  
Penna Ahobilam 20.0           0.52  
Chettipeta Mini Hydro 1.0           1.63  
APGENCO Hydro 1797.6 22.50 20.58 21.20 263.29   3230.46  
 Solar pant at polavaram 5.4 0.03 0.03 0.02 0.55 16.96 7.24 16.80
Solar plant at Talaricheruvu 400.0 2.53 2.61 2.30 58.96 24.57 611.78 19.25
APGENCO Solar 405.4 2.56 2.64 2.32 59.51 24.46 619.03 19.22
APGENCO Total 5613.0 63.73 62.44 63.86 1664.84   19971.58  
                   
Machkund (Total) 120.0 1.89 1.99 1.99 44.15   602.90  
Tungabhadra (Total) 72.0 0.73 0.65 0.56 18.04   180.42  
APPDCL                  
Total SDSTPS station 1600.0 14.82 20.82 15.46 420.97 43.85 6673.59 52.50
Outage of Thermal Units
RTPP 3 (210 MW) is under outage due to Generator rotor earth fault  from 14:10 on 02.02.20
RTPP 1 (210 MW) is kept under reserve stand by  from 16:35 on 23.02.20 to 23:33 on 25.02.20
RTPP 2 (210 MW) is kept under reserve stand by  from 20:47 on 22.02.20
RTPP 5 (210 MW) is kept under reserve stand by  from 20:26 on 18.02.20
RTPP 6 (600 MW) is under outage due shut down works from 05:19 on 20.02.20
Dr.NTTPS 3 (210 MW) is under outage due Mill problem from 14:43 on 25.02.20
Outage of Hydro Units
Machkund 5 (23 MW) is under outage from 12:42 on 15.01.20
Outage of SDSTPS Units
SDSTPS 2 (800MW) is under outage from 02:43 on 25.02.20