THERMAL POWER:
1. Dr.NARLA TATA RAO THERMAL POWER STATION Stage-V (1x800MW)
Salient Features:
|
Location |
Adjacent to the existing 1X500MW Unit-7 of DrNarla Tata Rao Thermal Power Station, Ibrahimpatnam, Krishna District, AP. |
|
Site |
Located on the left side of river Krishna at a distance of 2 KM between Ibrahimpatnam and Kondapally Villagein Krishna Dist. |
|
NearestRailwayStation/Highway |
Nearest railway station: Kondapally 3 km. High way: NH-9 |
|
Annual Energy Generation @80% PLF |
5606 MU |
|
Annual requirement of Coal |
4.72 mtpa @ 85% PLF |
|
Water requirement |
2000 M3/hr |
|
Source of Water |
Existing CW canal |
|
Source of Coal |
Coal from Mahanadi Coal Ltd. Orissa/SCCL. |
|
Station Heat Rate |
2061 Kcal/KWh |
|
Evacuation of Power |
Stepping up to 400 KV |
|
Chimney |
One 275 meter high RCC construction, single flue |
|
Land requirement |
Main Plant & Auxiliaries – 40 Acres. Water storage & facilities, Cooling tower etc.–15Acres. Coalstorage&handlingFacilities-30Acres. Ash dump Area - 230 Acres, Staff Colony - Available |
As per instructions of 142nd APGENCO Board, the project execution was taken up in two packages namely BTG package through M/s BHEL & BOP package through M/s BGRESL. 15.12.2015 is considered as Zero date for the project. Scheduled Completion Date is July, 2019. Energy generation is 16.32MU/day@ 85%PLF. Estimated total project cost is Rs. 7586.67 Crores.
Unit was synchronized to grid on 11.06.2023 and COD shall be by 30.11.2023.
HYDEL POWER
1. POLAVARAM HYDRO ELECTRIC PROJECT (12X80MW)
Salient Features:
|
1. |
Location |
: |
Power scheme is proposed at the location of “D” hill on the left side of the earth cum rock fill dam across river Godavari in East Godavari District of Andhra Pradesh. |
|
2. |
Reservoir |
: |
East Godavari, West Godavari in A.P & Khammam in T.S |
|
3. |
Head works |
: |
East and West Godavari Districts in A.P. |
|
Longitude / Latitude |
: |
810-46’E/170–13’N? |
|
|
4. |
Approach Channel |
||
|
Discharge Capacity |
: |
3972 Cumec |
|
|
Average Length |
206 m |
||
|
5. |
Intake Tunnels |
||
|
Number of tunnels |
: |
12 Nos. |
|
|
Discharging capacity |
331 Cumec |
||
|
Length of tunnel |
145 m |
||
|
Diameter of Tunnel |
9000 mm |
||
|
6. |
Intake Gates |
||
|
Number of gates |
: |
12 Nos. |
|
|
Size of gates |
: |
6.50m x 11.9 m |
|
|
7. |
Power House |
||
|
Runner diameter |
: |
6850 mm |
|
|
Size of Power House |
: |
385x26 m |
|
|
Service bay floor level |
: |
+26.000 m |
|
|
Unloading bay floor level |
: |
+35.00 m |
|
|
Distance between units |
: |
24 m |
|
|
No. & size of units |
: |
12 Nos. of 80 MW each |
|
|
Design Energy 1st Year |
: |
2308.41 MU |
|
|
35th Year |
: |
431.27 MU |
|
|
Turbines |
|||
|
Type |
: |
Vertical Kaplan, adjustable blade |
|
|
Net head |
: |
27 m |
|
|
Design discharge |
: |
331 Cumecs |
|
|
Transformer Location |
: |
D/s. of PH at EL 26.00 m. |
|
|
8. |
Tail Race Pool |
||
|
Section |
: |
Lined |
|
|
Bed Level at Start |
: |
-3.00 m |
|
|
Tail Race Channel |
|||
|
Length |
: |
1650 m |
|
|
Discharging capacity |
: |
3972 Cumecs |
|
|
9. |
Switch yard (GIS) |
: |
+35 m |
|
10. |
Power evacuation |
||
|
Voltage level |
: |
400 KV |
|
|
No. of feeder bays |
: |
2 |
|
|
Generator bays |
: |
12 |
|
|
Reactor bays |
: |
2 |
|
|
Bus Coupler bays |
: |
2 |
|
|
Bus sectionaliser bays |
: |
2 |
|
|
Transformer bays |
: |
2 |
|
|
12. |
Commissioning Schedule |
: |
2024-26 |
The Government of Andhra Pradesh proposed to construct a Dam (Indira Sagar Polavaram) across the river Godavari near Ramayyapeta village of west Godavari district about 34 KM from Rajahmundry. The Central Electricity Authority (CEA) MOP, Government of India, New Delhi has accorded Techno Economic Concurrence on 21.02.2012. The cost of Indira Sagar (Polavaram) Hydro Electric Scheme including I.D.C is revised to 2015-16 PL at 4814.60 Cr and is under review of APGENCO management.
The Principal Secretary to Govt. vide letter dt.13.04.2016 has informed that Government of Andhra Pradesh have accorded approval in principle for implementation of Indira Sagar Polavaram Hydro Electric Project (12X80MW) by APGENCO.
2. LOWER SILERU POWER HOUSE (ADDITIONAL 2 X 115 MW UNITS)
Salient Features
|
1 |
Location |
: |
Pollur Camp, Mothugudem in E.G Dist., |
|
2 |
Category |
: |
Hydro Electric Project |
|
3 |
Capacity |
: |
2 x 115 MW = 230 MW |
|
4 |
River |
: |
Sileru |
|
5 |
Dam |
: |
Donkarayi / Forebay |
|
6 |
Reservoir |
: |
Donkarayi |
|
7 |
Design Disch. through Machine |
: |
72 Cumecs (2534Cusecs) |
Forebay:
|
1 |
FRL |
: |
EL 930 Ft |
|
2 |
MDDL |
: |
EL 920 Ft. |
|
3 |
Live Storage |
: |
0.141 TMC |
|
4 |
Free Board |
: |
10 Ft. |
|
5 |
Top of Dam |
: |
940 Ft. |
|
6 |
Bed level of Stream |
: |
EL 770 Ft. |
|
7 |
Average Height of Dam |
: |
50 Ft. |
|
8 |
Length at Top |
: |
4450 Ft. |
|
9 |
Width |
: |
30 Ft |
3. UPPER SILERU PUMPED STORAGE HYDRO ELECTRIC STATION
Salient Features
|
1 |
Location |
: |
Upper Sileru |
|
2 |
Category |
: |
Pumped storage HEP |
|
3 |
Capaciy |
: |
9 X 150 MW = 1350 MW |
|
4 |
River |
: |
Sileru |
|
5 |
Stage of the project |
: |
DPR stage |
|
6 |
Annual Energy Generation |
: |
3501.89 MU |
|
7 |
Annual pumping energy |
: |
5105.14 MU |