ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
VIDYUT SOUDHA  ::  HYDERABAD - 500082
Daywise Generation Particulars as on  :  18-01-2017
Station Unit Capacity Daywise generation in MU 1st to 18th Jan 1st Apr to 18th Jan
(MW) 16-01-17 17-01-17 18-01-17 Gen (MU) PLF (%) Gen (MU) PLF (%)
Thermal Power Stations                
Dr.Narla Tatarao Unit 1 210.0 3.82 3.90 3.76 70.33 77.52 1093.89 74.08
(Vijayawada) Unit 2 210.0 3.87 3.85 3.74 73.59 81.12 1093.09 74.02
  Unit 3 210.0 4.12 4.10 3.94 77.64 85.58 1175.66 79.61
  Unit 4 210.0 4.10 4.07 3.93 76.09 83.87 935.80 63.37
  Unit 5 210.0 4.06 3.91 3.90 77.80 85.76 1161.72 78.67
  Unit 6 210.0 3.92 4.08 3.78 75.47 83.19 1135.15 76.87
  Unit 7 500.0 9.20 9.19 6.74 183.08 84.76 2825.80 80.37
  Station 1760.0 33.09 33.10 29.79 634.00 83.39 9421.10 76.12
Rayalaseema Unit 1 210.0       49.05 54.06 1042.16 70.57
  Unit 2 210.0 4.03 3.90 3.98 75.06 82.74 1137.25 77.01
  Unit 3 210.0 3.82 3.76 3.76 73.86 81.42 1063.53 72.02
  Unit 4 210.0 3.83 1.22   67.41 74.31 1082.59 73.31
  Unit 5 210.0 3.85 3.73 3.71 72.77 80.21 1103.99 74.76
  Station 1050.0 15.52 12.60 11.45 338.15 74.55 5429.53 73.53
APGENCO Thermal 2810.0 48.61 45.70 41.24 972.14 80.08 14850.62 75.16
Hydro Power Stations                  
Machkund (AP Utilisation) 84.0 1.01 1.11 1.07 19.92   297.45  
Tungabhadra (AP Utilisation) 57.6           61.90  
Upper Sileru 240.0 1.73 0.32 0.16 19.63   199.72  
Donkarayi 25.0 0.35 0.12 0.36 4.73   43.08  
Lower Sileru 460.0 2.49 2.58 3.60 53.67   563.36  
Srisailam Right 770.0 2.50 2.36 4.89 48.10   498.94  
NS Right Canal 90.0           6.67  
NS Tail Pond Dam   25.0     0.01 1.97   1.97  
Penna Ahobilam 20.0 0.09 0.09 0.09 1.20   12.32  
Chettipeta Mini Hydro 1.0           1.45  
APGENCO Hydro 1772.6 8.17 6.56 10.18 149.20   1686.87  
APGENCO Solar 5.4 0.02 0.02 0.02 0.39   1.27  
APGENCO Total 4588.0 56.78 52.26 51.43 1121.35   16538.38  
                   
Machkund (Total) 120.0 2.21 2.23 2.17 40.17   586.49  
Tungabhadra (Total) 72.0           81.06  
APPDCL                  
Total SDSTPS station 1600.0 28.84 27.66 26.67 450.27 65.14 6846.59 60.85
Outage of Thermal Units
RTPP 1(210 MW) is under Reserve shutdown due to low grid demand from 11:00 on 14.01.17
RTPP 4(210 MW) is under shutdown due to flame failure and kept under reserve standby due to low grid demand  from 08:04 on 17.01.17
Dr NTTPS 7(500 MW) is under outage due to Boiler tube leak  from 18:15 on 18.01.17
Outage of Hydro Units
Machkund 3 (17 MW) is under outage due to turbine vibrations from 10:05 on 04.03.16
Outage of SDSTPS Units
Nil